China Construction Machinery Imp&Exp Co., Limited
|
Gold Index: 10388
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
S6D107 Starter Motor Komatsu Spare Parts for Excavator Diesel Engine Type
S6D107 Starter Motor Starting Motor 600-863-5111 for Komatsu Excavator PC200-8 PC220-8
Quick Details:
Part Name |
Starter Motor |
Part Number |
600-863-5111 |
Material |
original standard |
Package |
Standard exporting packing |
Application |
Komatsu Excavator |
1)Undercarriage spare parts:Track shoe,Track Link,Bolt,Track roller,Carrier Roller,Sprocket,Front Idler,Idler Cushion
2)Engine spare parts:Cylinder Head, Cylinder Block, Turbocharger, Piston, Piston Ring, Metal, Crankshaft, Oil Pump, Fuel injection Pump, Water Pump, Alternator, Starting Motor
3)Hydraulic spare parts: Main Valve, Main Pump, Solenoid Valve, Boom/Arm/Bucket Cylinder, Final Drive, Travel Motor, Swing Machinery, Swing Motor
4)Operator’s Cab spare parts:Cab Ass’y, Monitor, Controller, Engine Controller, Wiring Harness, Seat, Air Conditioner, Air Compressor
5)Cooling parts:Radiator,heat sink,air conditioner,compressor,after cooler,water cooler,hydraulic oil cooler etc.
6)Other parts:Service kit,swing circle,engine hood,swivel joint,fuel tank,filter,boom,arm,bucket ect.
Packaging & Shipping
Standard export packing (water proof,damp proof and mould proof and fumigation-free).
DELIVERY
1. Usually, the goods will be dispatched within 3 days after receipt of payment.
2. Upon receipt of payment, IN-STOCK items will ship on or before the next business day.
3. International Express: Such as DHL, UPS, FEDEX and so on.
Air transportation: For goods above 45KG, it is economic choice for customers.
By sea: Heavy cargo by container transport
WEIGHT |
RECOMMENDED TRANSPORT MEANS |
TRANSPORT TIME |
COMMENTS |
<50kg |
express- |
3-7 days |
fast |
UPS/DHL/FEDEX |
convenient |
||
door to door service |
expensive |
||
50-150kg |
by air |
3-10 days |
fast; |
economic; |
|||
consignee has to do customs clearance |
|||
150>kg |
by sea |
10-50 days |
slow; |
economic; |
|||
it takes some time for customs declarance and clearance |
|||
2x20' or 1x40' |
by rail |
20-35 days |
slow; |
economic
China Construction Machinery Imp&Exp Co., Limited [China (Mainland)]
Business Type:Manufacturer |